We have executed various jobs in the Oil Sector. A short list of jobs undertaken for the last 5 years will give you an insight of our activities:

Among companies that we execute works for are:

  • RAS LANUF OIL & GAS PROCESSING Co. - RASCO
    Ras Lanuf
    G.S.P.L.A.J

  • SIRTE OIL COMPANY FOR PRODUCTION, MANUFACTURING OIL & GAS - SOC
    Brega
    G.S.P.L.AJ

  • ARABIAN GULF OIL COMPANY - AGOCO
    BENGHAZI
    G.S.P.L.A.J

  • AZZAWIYA OIL REFINING COMPANY - ARC
    AZZAWIYA
    G.S.P.L.A.J

  • BREGA PETROLEUM MARKETING COMPANY - BPMC
    ZAWIA
    G.S.P.L.A.J

  • ZUEITINA OIL COMPANY - ZOC
    TRIPOLI
    G.S.P.L.A.J

  • LIBYA-RASCO, Ras Lanuf
    INSTALLATION OF VALVES IN FIRE WATER SYSTEM
    New control system for the pressure in the fire fighting system pipeline was installed in order to stabilize the pressure in the piping system and eliminate often ruptures of the pipes

  • LIBYA-RASCO, Ras Lanuf
    INSTALLATION AND REFURBISHMENT OF FIRE FIGHTING COLD DETECTORS
    The work consists of laying of new detector cables, replacements and erection of junction boxes, glands, cold detectors, interconnection of cables and testing of the system.

  • LIBYA-SOC, Brega
    FIRE FIGHTING SYSTEM FOR DELUGE KNOCK OUT DRUM
    Erection of the new fire fighting system for the existing knockout drum with related connection FRP pipeline and signal and power cables installation.

  • LIBYA-SOC, Brega
    36” COOLING WATER LINE REPLACEMENT
    Replacement of the underground 36” Cooling Water Line in the Gas Plant Area complete with excavation up to 4-meter depth and shoring. Part of the piping is running through gas plant and has been replaced during normal plant operation. The work includes casting of RC valve pits and cathodic protection system with installation and digging of one cathodic protection deep ground bed complete with installation with anodes.

  • LIBYA-SOC, Hateiba & Assamoud
    INSTALLATION OF PUMP FACILITIES
    The work consists of trenching, excavation and construction of concrete pump bases, installation of electrical driven condensate pumps, fabrication and installation of the pipes, fittings, pipe supports and valves and coating of piping and steel structure. Prefabrication and assembly of related electrical and instrumentation systems. Organization of commissioning of assembled systems including Hartman & Braun DCS.

  • LIBYA-AGOCO, Nafoora
    MAJOR OVERHAUL OF TANK D1 AT CPS AREA, NAFOORA OIL FIELD
    The work consists of de slugging, cleaning, patching of bottom and replacement of the roof structure and plates, external painting, removal and reinstating of instruments and cathodic protection and repair of the internal epoxy lining. Additionally, the work consists of complete replacement of fire water sprinkler rings and foam protection system and their supply piping. Detailed engineering and procurement of materials is done as well.

  • LIBYA-AGOCO, Ghanfooda
    FIRE PROTECTION AND FIRE DETECTION WORKS - GANFOODA
    The work consists of upgrading of existing Fire detection system in warehouses and telecommunication buildings and modification of existing main Fire detection control panel. Also work includes extension of existing Fire main, installation of hydrants and replacement of existing diesel fire water pump.

  • LIBYA-AGOCO, Beda Field
    REPLACEMENT OF TANK D-301 AT GS-3 BEDA FIELD
    The work consists of construction of a new crude oil storage tank in Beida Field to replacement damaged storage tank and these works include new interconnecting pipe work, instrumentation, electrical, civil and mechanical works to meet the operating process conditions, fire water sprinkler system and foam protection system. Detailed engineering and procurement of materials is done as well.

  • LIBYA-AGOCO, Nafoora
    FIRE FIGHTING UPGRADE FOR GOSP-03 ACCOMODATION AND WAREHOUSE AREAS (DETECTION/TANKS/PUMPING) IN NAFOORA
    The work consists of upgrading of existing Fire detection and Fire Alarm system in warehouses and accommodation buildings and installation of new main Fire detection control and mimic panel and repeater panels. Also work includes extension of existing Fire main, installation of hydrants and monitors, isolation valves, erection of new fire water pump house (diesel, electric and jockey pumps). Detailed engineering and procurement of materials is done as well.

  • LIBYA-ARC, Azzawiya Refinery
    AUTOMATIC F/F & F/A SYSTEM IN LUBE OIL PLANT BUILDING, WAREHOUSE, TECHNICAL LIBRARY & DRAWING OFFICES AT AZZAWIYA REFINERY
    Replacement of the existing fire detection and fire alarm system for old and new warehouses, offices and technical library and replacement of fire detection and high expansion foam system for protection of lube oil plant building. Project includes detailed engineering, in accordance with NFPA Standards, procurement and installation of all materials including fire alarm panels, fire detectors, piping and electrical works.

  • LIBYA- BPMC, Zawia – Terminal
    MAINTENANCE OF AL ZAWIA OLD TERMINAL
    The work consists of design, procurement and complete or partial replacement and refurbishment of tanks, pump houses, LPG spheres, truck loading gantry, electrical substation, instrumentation control system and control room, electrical and instrumentation cables and fire fighting system. Includes mechanical, piping, electrical, instrumentation, civil and fire fighting works.
     

  • LIBYA-BPMC, Benghazi Terminal
    REPLACEMENT AND UPGRADING OF FIRE FIGHTING SYSTEM AT RAS EL MUNGAR TERMINAL
    The work consists of replacement of part of main fire water piping system, roof and top roof sprayers, shell cooling sprayers, foam sprayers and automatic sprinkler heads for terminals tanks, spheres etc; overhauling of associated hydrants, valves etc.

  • LIBYA-ZOC, Sabah Field
    EXTENSION TO EXISTING FIRE HYDRANT SYSTEM AT SABAH
    The work covers conceptual and detailed design, supply of materials, site survey, right-of-way, load & haul, underground installation of two fire water hydrant system loops 12” GRE with ten hydrants, ten hose cabinets and two monitors, hydrostatic testing and commissioning.

  • LIBYA-ZOC, Zueitina Terminal
    UPGRADE OF FIRE WATER MAINS AT LPG PLANT AT ZUEITINA TERMINAL
    The work covers conceptual and detailed design, supply of materials, site survey, underground installation of new 10” GRE pipes to provide seven new hydrants and seven monitors, hydrostatic testing and commissioning.

  • LIBYA-RASCO, Ethylene plant, Refinery, Utilities
    BREAK DOWN & REGULAR MAINTENANCE
    Regular yearly, break down and T/A maintenance of plant facilities (mechanical, safety valves, electrical, instrumentation, etc.)

  • LIBYA-RASCO, Engineering Department
    DATA ENTRY OPERATION / SOFTWARE MAINTENANCE
    Services of software maintenance and upgrade for Engineering department. Services were given in maintenance, operation and setting up of the computer software and hardware systems related to data bases for computer tracking of documentation and drawings. Updating, making and maintaining of Microfilm track-up software.

  • LIBYA-RASCO, Ethylene plant, Refinery, Utilities
    INSTALLATION OF HIGH VOLTAGE SUBSTATIONS
    Work consists of replacement of old high voltage cables and testing and commissioning of new high voltage cables. Installation, testing and commissioning of new high voltage 30 kV switchboards, panels, relay panels etc.

  • LIBYA-RASCO, Laboratory
    NEW POWER SUPPLY FOR LABORATORY
    Cabling, testing, commissioning and start-up. Installation of a new UPS system for the laboratory requirements.

  • LIBYA-RASCO, Ethylene plant
    INSTALLATION OF CAUSTIC SODA PIPELINE – 6”
    Delivery, erection/installation of pipeline, installation of electrical power distribution system, trace heating, testing, commissioning and start-up.

  • LIBYA-RASCO, Utilities
    BOILER MAINTENANCE
    Refurbishment and General mechanical maintenance of the Borsig Boilers in the Utility Plant.

  • LIBYA-RASCO, Ethylene plant
    REFURBISHMENT OF QUENCH OIL TANK AT ETHYLENE. OFFSITE
    Delivery and replacement of damaged piping sections, painting of tank externally, insulation of tank, complete revamp of electrical and instrument cables, electrical and instrument equipment, testing, commissioning and start-up.

  • LIBYA-RASCO, Ethylene off-sites
    SUPPLY OF MATERIAL & EQUIPMENT, CONSTRUCTION, INSTALLATION, TESTING, COMMISSIONING AND START-UP OF TWO NEW REFRIGERATION UNITS (UDEC).
    The work consisting of erection of two new compressor units complete with all related civil work, interconnecting pipeline, painting & insulation. Connection and installation of electrical and instrument equipment complete with calibration of instruments & safety valves. Testing and commissioning of the overall system.

  • LIBYA-RASCO, Services department
    PAINTING & SCAFFOLDING ASSISTANCE

  • LIBYA- RASCO, Ras Lanuf
    MECHANICAL MAINTENANCE
    Regular and break down mechanical maintenance of the facilities and equipment in Utilities Area.

  • LIBYA-RASCO, Ras Lanuf
    BOTTOM PLATES REPLACEMENT FOR TANK 2100-FT-01
    The work consist of complete removal and erection of bottom plates and annular ring for the fuel Tank with removal and replacement of sub grade, internal and external painting, repair of damaged insulation, repair of corroded area and roof area by replacement, spot welding or patching.
    The tank is 63.6 meters in diameter and 16.1 meters height.

  • LIBYA – RASCO, Ras Lanuf
    ASSISTANCE OF INSULATION CREW
    The work consists of providing the services of insulation crews consisting of insulation fabricators, fitters and erectors.

  • LIBYA – RASCO, Ras Lanuf
    FRP PIPE REPLACEMENT AT DESALINATION UNIT
    The work consists of dismantling of the existing 28”, 24” & 20” FRP pipes, fabrication and installation of new FRP pipes and hydrostatic test of FRP pipes.

  • LIBYA-RASCO, Ras Lanuf
    REPLACEMENT OFEXISTING UNDERGORUND BOILER BLOWDOWN VESSELS 20-Q-33 A & B
    The work consists of disconnection of pipe, electrical and instrument connections, excavation and removal of existing vessels, installation of new vessels, installation of cathodic protection, reconnection of pipe, electrical and instrument connections and backfilling.

  • LIBYA-RASCO, ETP Area
    NITROGEN BLANKETING FOR THE INCINERATOR TANK
    The work consists of fabrication and installation of new 2” pipeline, tank’s nozzles, vents, drains and instrumentation and sandblasting and painting of new pipeline and pipe supports.

  • LIBYA-SOC
    DRUM D-701 INSTALLATION (250 tons)
    Installation of the new Drum 701 with the total weight of 250 t. The drum was pulled during out of the plant normal plant operation by hydraulic hauling since no access for regular lifting devices was possible.
    The drum has been hauled back to place by hydraulic hauling since the operation couldn’t be done by crane due to extreme weight of the drum on congested area. Complete electrical and instrument hook-up and installation, testing and commissioning.

  • LIBYA-SOC, Brega
    TANK FARM & CENTRAL FUEL DISTRIBUTION SYSTEM.
    Completion of project that was started by other Contractor. Works consisted in supplied of material & equipment, construction, civil, mechanical and electrical works. Regular maintenance of supplied equipment, testing, commissioning of all piping and electrical works up to turn over of facilities.

  • LIBYA-SOC, LNG Plant, UREA, Plant, Refinery & Utilities
    REGULAR MAINTENANCE ASSISTANCE
    All kind of maintenance works in regular yearly maintenance contract and T/A (mechanical, safety valves, electrical, instrument etc.), all kind of construction, installation, testing and commissioning.

  • LIBYA -SOC, Brega, Terminal Marsa El Brega
    Divers services – REPAIR OF BERTH No 5.
    Berth No 5 anchored on 50 meters depth was disconnected in first phase and after repair by SOC towed in place and connected to Anchor chains and new flexible supplies line 24" attached.

  • LIBYA-SOC, Zelten field
    AIR COMPRESSOR FILTER REPLACEMENT
    Modification and change of filters on Air compressors in Zelten field (4 sets on different compressors were replaced during shut down of units)

  • LIBYA-SOC, Brega
    RE-CABLING of UREA PLANT
    All underground electrical cables in Urea Plant were replaced by aboveground cables (including installation of new cable trays and trays supports), testing, commissioning and start-up without stopping of plant operation.

  • LIBYA-SOC, Brega
    METHANOL PLANT RE-CABLING.
    All underground electrical cables in Methanol Plant are to be replaced by aboveground cables (including installation of new cable trays and trays supports), testing, commissioning and start-up without stopping of plant operation.

  • LIBYA-SOC, Hateiba
    HATEIBA FIELD CATHODIC PROTECTION FOR S-20 & S-21
    Drilling of deep anode ground beds and supply and installation of related cathodic protection equipment and material and connection to related piping and facilities. Supply and installation of Thermo-Electric Generator and connection to related facilities.

  • LIBYA-SOC, Brega
    AMMONIA TANK REFURBISHMENT.
    Supply of material, complete external painting, removal of old insulation, scaffolding, re-insulation and revamping of the Ammonia Tank 33m diameter & 31 meter high and related piping and instruments. The insulation consisted of cold (PUR) insulation which was applied by injection method.

  • LIBYA-SOC, Misurat/Sirte
    PAINTING OF LV STATIONS
    Blasting & painting of the valves on the existing 34” & 12” Misurata & Sirte Line. Consisted of painting of valves and above ground pipes on 13 location of line valve station on the main Brega-Holms gas pipeline. A mobile crew has undertaken the job.

  • LIBYA-SOC, Brega
    INSTALLATION OF NEW POWER STATION
    Work consists of installation, testing and commissioning of high voltage switchboards, panels and relays with transformers and fuse switches. Installation, termination and commissioning of high voltage cables.

  • LIBYA-SOC, Brega
    ERECTING OF SOLAR PANELS
    The work consists of erection of the solar power station on two locations of the line valve stations of the main Brega-Holms gas pipeline complete with related wiring and equipment installation

  • LIBYA-SOC, Brega
    ANTENNA REPLACEMENT
    The work consists of removal of the communication antennas and related cables from the communication towers in SOC, Brega. Height of the towers are ranging up to 110 meters.

  • LIBYA-SOC, Km 110
    DEEP ANODE CATHODIC PROT. GROUND BED AT km 110
    Drilling of deep anode ground bed and supply and installation of related cathodic protection equipment and material and connection to related piping and facilities

  • LIBYA-SOC, Brega
    REPLACEMENT OF THE CHLORINATION LINE IN DESAL
    The work consists of excavation, removal of the existing chlorination line and installation of the new UPVC chlorination line.

  • LIBYA-SOC, Brega
    REPLACEMENT OF CATHODIC PROTECTION GROUND BED AT REFINERY TANK FARM
    Drilling of deep anode ground beds and supply and installation of related cathodic protection equipment and material and connection to related piping and facilities.

  • LIBYA-SOC, Brega
    REPLACEMENT OF THE EXISTING 20” & 14” ISOL. VALVES
    The work consisted of replacement of the 20” & 14” valves, which were not functioning properly with related piping and corrosion protection/ painting.

  • LIBYA-SOC, Jebel
    JEBEL CATH. PROTECTION AND POWER SUPPLY SYSTEM
    The work consists of procurement and installation of the complete new cathodic protection system consisting of 20 200-meters deep anode ground beds complete with drilling of ground beds and installation of the complete cathodic protection equipments and solar power supply stations. The work also comprises the installation of the high voltage 4.6 kV overhead power supply lines with all related poles and equipment installation. Installation, testing and commissioning of high voltage 4.6 kV switchboards and panels.

  • LIBYA-SOC, Zelten
    ZELTEN GOSP CATHODIC PROTECTION SYSTEM
    The work consists of drilling of eight deep anode ground beds, installation of anodes, anode junction boxes, backfilling of deep anode ground beds, pulling and termination of cables, fabrication and installation of crash barriers, installation of grounding and testing and commissioning of ground beds.

  • LIBYA-SOC, Brega
    VENT STACK EXTENSION V-702 AT UREA PLANT
    The work consists of fabrication and installation of 10” extension of existing vent stack, pipe supports and new steam piping and tie-in to existing piping.

  • LIBYA-SOC, SOC-Brega
    FLOOR REPLACEMENT & PAINTING OF DIESEL TANK
    The work consists of disconnecting and isolation of piping, instrumentation and electrical installations for the tank, removal of existing floor plates and installation of new bottom plates, repair of concrete tank base, internal and external painting, vacuum and hydrostatic testing.

  • LIBYA-MAN, SOC-Brega
    GLRU MODIFICATION
    The work consists of installation of power distribution and motor control, installation of cable trays, cable pulling and termination, grounding system, assembly and erection of instrument equipment, instrument air tubing, tie in to existing sources, testing and calibration, removal and re-installation of insulation and painting of pipe supports, piping and steel structure.

  • LIBYA-SOC, Brega, Terminal Marsa El
    MP-822 AMONIA II ABSORBER AND DESORBER PAINTING AND INSULATION
    The work consists of erection of scaffolding around the Desorber and Absorber columns. De-lagging of existing weather proofing and insulation from the columns and insulated associated pipe work. Sandblasting and prime coating all insulated surface of the columns and insulated pipe work. Installation of new thermal insulation weather proofing on the insulated equipments and insulated pipe work.

  • LIBYA-SOC, Brega, Terminal Marsa El
    MP-822 AMONIA II ABSORBER AND DESORBER PAINTING AND INSULATION
    The work consists of erection of scaffolding around the Desorber and Absorber columns. De-lagging of existing weather proofing and insulation from the columns and insulated associated pipe work. Sandblasting and prime coating all insulated surface of the columns and insulated pipe work. Installation of new thermal insulation weather proofing on the insulated equipments and insulated pipe work.

  • LIBYA-AGOCO, Tobruk
    REFURBISHMENT OF CRUDE OIL TANKS T03 & T04
    The Tanks are dia=67m Height 17m
    The scope of work included Mechanical repairs on bottom and floating roof, annular ring replacement, new floating roof seal installation, internal and external painting. The project was mechanically completed ahead of schedule.

  • LIBYA-AGOCO, Beda
    REFURBISHMENT OF THREE TANKS D-101, D-102 & D-402
    The work consists of de-slugging, cleaning and replacement of bottom and roof plates for three tanks in BEDA Oilfield with demolition of the old and casting of the new concrete ring foundation, internal and external painting, removal and reinstating of instruments and cathodic protection and replacement of roof supporting structure.

  • LIBYA-AGOCO, Beda
    REFURBISHMENT OF TANK D-2
    The work consists of de slugging, cleaning, patching of bottom and replacement of the roof structure and plates, external painting, removal and reinstating of instruments and cathodic protection and repair of the internal epoxy lining.

  • LIBYA-AGOCO, Tobruk Refinery
    REFURBISHMENT OF FOUR TANKS T-833, T-834, T-835 & T-836
    The work consists of cleaning, internal and external painting, removal and reinstating of instruments and cathodic protection and repair and re-adjustment of the floating roof deck and seal.

  • LIBYA-AGOCO, Sarir
    REPLACEMENT OF 147 Nos. of (4”) AUDCO PLUG VALVES ON GC-2 MANIFOLD
    The work consists of dismantling and installation of 4” Plug Valves (147 pieces). Job has been completed in a one-week time.

  • LIBYA-AGOCO, Sarir-Tobruk
    INSTALLATION OF THE CATHODIC PROTECTION SYSTEM
    Drilling of deep anode ground beds, and installation of the related CP material and equipment complete with commissioning, testing and putting of the system into operation. The work is executed along the Sarir – Tobruk pipeline.

  • LIBYA-AGOCO, Sarir
    REPAIRING OF GASOLINE TANK T-708
    The work consists of repositioning of floating roof to lower position, cutting of existing and fabrication and installation of new 8” vertical floating roof guide, dismantling and replacing of damaged seal parts, hydrostatic testing of roof drain system, repair of roof rolling ladders, sandblasting and painting of floating roof and checking and repair of tank’s instrumentation.

  • LIBYA-AGOCO, Marsa El Heirigha, Tobruk
    REFURBISHMENT OF CRUDE OIL TANKS T02, T06 & T08
    The Tanks are dia=67m Height 17m
    The scope of work includes cutting and removal of existing tank bottom and installation of new bottom plates, repair of floating roof, annular ring replacement, new floating roof seal installation, internal and external painting, vacuum and hydrostatic testing.

  • LIBYA-AGOCO, Beda
    RE-BOTTOMING & BOTTOM PAINTING OF WASH TANK D-2
    The work consists of removal of existing floor plates and installation of new bottom plates, sand bed replacement, sandblasting and painting of new bottom plates, construction of a ring wall, installation of anodes and hydrostatic testing.

  • LIBYA-AGOCO, Nafoora
    REFURBISHMENT OF ABSORBER GAS DEHYDRATION UNIT
    The work consists of internal cleaning of absorber, refurbishment of transfer valves, removal and replacement of existing fiber glass coating, sandblasting and painting of absorber internally and externally.

  • LIBYA-AGOCO, Sarir
    MODIFICATION OF 12” HEADERS & BRANCHES
    The work consists of site surveying, pre-fabrication and installation of headers in separator units, hydrostatic testing, sandblasting and painting of headers.

  • LIBYA-AGOCO, Nafoora
    REPLACEMENT OF ANODE STRINGS
    The work consists of drilling of 14 new deep ground beds, installation of PVC casing and Anode Strings, termination of cables, measuring of TR unit output and commissioning. Measuring of TR unit output, replacement of Anode Strings, termination of cables, measuring of TR unit output and commissioning for 136 existing deep ground beds. Cleaning, sandblasting and painting of 150 deep ground bed Wellheads for ‘ChemLine 784/32’.

  • LIBYA-AGOCO, Beda Field
    REPLACEMENT OF THE CORRODED FLOW LINES FOR OIL WELLS AT BEDA OIL FIELD
    The work consists of prefabrication, installation, testing, wrapping/painting of 14 km 4” pipeline.

  • LIBYA-AGOCO, Nafoora
    UPGRADING OF CATHODIC PROTECTION SYSTEM NAFOORA FIELD
    The work consists of drilling of sixteen deep anode ground beds, installation of anodes, anode junction boxes, backfilling of deep anode ground beds, pulling and termination of cables, fabrication and installation of crash barriers, installation of grounding and testing and commissioning of ground beds. Installation Solar power unit. The work also comprises the installation of the high voltage 11 kV overhead power supply lines with steel poles and equipment installation.

  • LIBYA-AGOCO, Beda
    REFURBISHMENT OF TANK D-301
    The work consists of de-slugging, cleaning and replacement of bottom and roof plates with demolition of the old and casting of the new concrete ring foundation, internal and external painting, removal and reinstating of instruments and cathodic protection and replacement of roof supporting structure.

  • LIBYA-ARC, Azzawiya
    INSTALLATION OF THE DOSING PUMP SYSTEM
    Installation of the dosing system for the Refinery requirements with related civil work, dosing pump installation and related power and instrumentation and control work.

  • LIBYA-ARC, Azzawiya & Benghazi
    TECHNICAL ASSISTANCE IN REGULAR MAINTENANCE FOR 2001, 2002 & 2003
    Regular maintenance of the Complex in Azzawiya Refinery Complex & Benghazi including regular, preventive and break down maintenance of Refinery facilities as well as the oil filling line with complete maintenance of the machines for filling and production of cans.

  • LIBYA-ARC, Azzawiya
    TECHNICAL ASSISTANCE
    Assistance in the Azzawiya Refinery T/A 2000 to a total of 98 technicians.

  • LIBYA- BPMC, Tobruk – Terminal
    MAINTENANCE FUEL TANKS No.: (201-203-204) AT 28 MARCH TERMINAL TOBRUK
    The work consists of disconnection and insulation the tank. Cut all corroded places on the bottom plates. Prefabrication erection and installation welding sand blasting and touch up painting of new patching parts of the bottom. Repair of tank roof. Closing of the tank and re-connection of the tank piping and instrumentation.

  • LIBYA-BPMC, Janzour Tank Farm
    JANZOUR TANK FARM CP SYSTEM
    The work consists of drilling of two deep anode ground beds, installation of anodes, anode junction boxes, backfilling of deep anode ground beds, pulling and termination of cables, fabrication and installation of crash barriers, installation of grounding and testing and commissioning of ground beds.

  • LIBYA-BPMC, Benghazi Terminal
    MAINTENANCE WORKS AT RAS EL MUNGAR TERMINAL
    The work consists of replacement of obsolete grounding system (about 18 km grounding cables, junction boxes, lightning system etc.) and replacement of Eex II d lighting fixtures and cables at LPG filling plant.

  • LIBYA-ZOC, Zella Field
    REPLACEMENT OF 20” WATER FLOOD PIPELINE BETWEEN ZELLA WATER FLOOD AND ZELLA PLANT
    The work consists of underground installation of approximately 12 kilometers of 20” water flood GRE pipeline between Zella Water Flood and Zella Plant including site survey, right-of-way, load & haul, trenching, sand bedding, pipe installation, backfilling, road crossings, hydrostatic testing and commissioning.

  • LIBYA – BONATTI
    INSTRUMENTATION AND ELECTRICAL WORK ASSISTANCE
    Technical Assistance for electrical and instrumentation work on various new fields in the Desert area.

  • LIBYA-MAN
    INSTRUMENTATION AND ELECTRICAL ASSISTANCE
    Technical Assistance for electrical and instrumentation work on various new fields in the Desert area.

  • LIBYA-MAN
    INSULATION WORK ASSISTANCE
    Technical Assistance for insulation work on various new fields in the Desert area.

  • LIBYA-INTERBETON
    INSTRUMENTATION WORK ASSISTANCE
    Technical Assistance for Instrumentation work on various fields in the Zueitina terminal.

  • LIBYA-MAN
    ERECTING AND INSTALLATION OF THE NEW HIGH VOLTAGE O/H LINE
    The work consisted of erecting, installation and pulling of the new O/H HV line in the total length of 40 km in the Brega Area. The work has been fully executed by Bosna-S on Sub contractor basis as a lump sum job.

  • LIBYA-STFA
    INSULATION WORK ASSISTANCE
    Technical Assistance for insulation work on the project in Brega.

  • LIBYA-KARRENA, SOC-Brega
    METHANOL 1 REFORMER – RE-INSULATION
    The work consists of removal of the existing brick insulation and installation of the new Dura blanket insulation inside the methanol reformer with related adjustment of the internal supporting steel structure and roof structure in order to be able to support and accommodate the new type of insulation. The Reformer has been completely scaffolded internally.

  • LIBYA-TECHNOSUB, SOC-Brega
    TECHNICAL ASSISTANCE
    Technical Assistance for mechanical and insulation works.

  • LIBYA-INTERBETON, SOC-Lehib
    INSTALLATION OF CATHODIC PROTECTION SYSTEM
    Installation of Cathodic Protection System and cad weld termination of cables to related pipelines and facilities for Gas Lift System at Lehib Field.

  • LIBYA-KARRENA, SOC-Brega
    METHANOL 2 REFORMER – RE-LINING
    The work consists of installation of refractory materials into relining of Methanol 2 Reformer.

  • LIBYA-INTERBETON, SOC-Lehib
    INSTRUMENT CALIBRATION
    Calibration and installation of various instrument for Gas Lift System at Lehib Field.

  • LIBYA-INTERBETON, SOC-Lehib
    TESTING & COMMISSIONING OF CP SYSTEM
    Checking and measurement of various components of Cathodic Protection System, start-up of Cathodic Protection System and commissioning of Cathodic Protection System for Gas Lift System at Lehib Field.

  • LIBYA-IV OIL & GAS, Nafoora
    INSULATION WORK ASSISTANCE
    Technical Assistance for insulation work on various fields in the Desert area.

  • LIBYA-MAN, Lasmo
    TECHNICAL ASSISTANCE
    Technical Assistance for electrical, instrumentation and insulation works on F-NC 174 Elephant Field Development Project.

  • LIBYA-VEBA, Amal-Ras Lanuf
    30”&36” TRANSFER PIPELINE CATHODIC PROTECTION
    The work consists of drilling two deep anode ground beds, replacement of six solare energy units, installation of two anode junction boxes and two anodes chains; installation of twenty seven C.P. pipeline test stations c/w associated pipe pin braze connections and cables; testing and commissioning of system.
  • Contact us

    Bosna-S
    Nova 26,
    71000 Sarajevo
    Bosnia and Herzegovina

    Phone:
    +387 33 27 80 40

    Fax:
    +387 33 20 00 74

    E-mail:
    info@bosna-s.ba