Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Refurbishment of six (6) storage tanks (each: diameter 58m and 21m high). The work consists of tank’s isolation and dismantling of instruments, pipes, followed by de-slugging, cleaning and reparation of bottom and shell after Ultrasonic Survey. Washing and painting of tank’s shell – external.
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field
The scope of work included mechanical erection of one Titan 130 Mobile Power Unit and its ancillary equipment as well as all interconnecting piping works, electrical works,