Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Summary of the Project:
Refurbishment of six (6) storage tanks (each: diameter 58m and 21m high).
The work consists of tank’s isolation and dismantling of instruments, pipes, followed by de-slugging, cleaning and reparation of bottom and shell after Ultrasonic Survey. Washing and painting of tank’s shell – external.
As part of this project a detailed inspection of 30”, 24”, 18” and 6” pipelines respectively was carried out in order to determine the condition of the pipelines. Inspections were carried out by specially trained engineers utilizing ultrasonic equipment.
More Projects
Design, Supply and erection of three Tanks for Kerosene and one Floating Roof Tank for Gasoline at Misurata Terminal
Modernization of Fire Fighting System – Zelten Field Facilities
Installation of 2-18mw Gas Turbine Generator sets at GC1 Sarir Field
Maintenance of Al Zawia Old Terminal
Upgrading of Cathodic Protection System for Nafoora Field
Supply & Installation of new 12" HFO line for Injecting Heavy Fuel Oil into Crude Oil for Export at Tobruk Refinery
Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field