Inspection & Enabling works for Tanks at Zawia Tank Farm Fields

Summary of the Project:

Refurbishment of six (6) storage tanks (each: diameter 58m and 21m high).
The work consists of tank’s isolation and dismantling of instruments, pipes, followed by de-slugging, cleaning and reparation of bottom and shell after Ultrasonic Survey. Washing and painting of tank’s shell – external.

As part of this project a detailed inspection of 30”, 24”, 18” and 6” pipelines respectively was carried out in order to determine the condition of the pipelines. Inspections were carried out by specially trained engineers utilizing ultrasonic equipment.