Installation of 2-18mw Gas Turbine Generator sets at GC1 Sarir Field
Summary of the Project:
The project scope of work consists of mechanical erection of two 18MW Solar Gas Turbine and all ancillary equipment such as fuel gas booster skids, fuel gas treatment skid, liquid fuel treatment skid, and water treatment package as well as complete prefabrication and erection of interconnecting piping and necessary coating and insulation works.
Works also include installation of low voltage local electrical room, laying down and termination of all low voltage cables, installation of field instruments and laying down and termination of all instrumentation and control cables as well as installation of earthing and grounding for equipment and structures.
-
Project Name
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field
-
Client
Renco/ Arabian Gulf Oil Company
-
Type of Contract
Erection
-
Project Location
SARIR, LIBYA
More Projects
Design, Supply and erection of three Tanks for Kerosene and one Floating Roof Tank for Gasoline at Misurata Terminal
Modernization of Fire Fighting System – Zelten Field Facilities
Installation of 2-18mw Gas Turbine Generator sets at GC1 Sarir Field
Maintenance of Al Zawia Old Terminal
Upgrading of Cathodic Protection System for Nafoora Field
Supply & Installation of new 12" HFO line for Injecting Heavy Fuel Oil into Crude Oil for Export at Tobruk Refinery
Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field