Installation of one (1) Titan 130 Mobile Power Unit at 103D Field
Summary of the Project:
The scope of work included mechanical erection of one Titan 130 Mobile Power Unit and its ancillary equipment as well as all interconnecting piping works, electrical works, instrumentation works and civil works including construction of a mat foundation for the mobile power unit.
More Projects
Design, Supply and erection of three Tanks for Kerosene and one Floating Roof Tank for Gasoline at Misurata Terminal
Design, supply, prefabrication and erection of three...
Modernization of Fire Fighting System – Zelten Field Facilities
Engineering, procurement, construction, installation,...
Installation of 2-18mw Gas Turbine Generator sets at GC1 Sarir Field
The project scope of work consists of mechanical erection...
Maintenance of Al Zawia Old Terminal
Engineering, procurement and complete or partial replacement...
Upgrading of Cathodic Protection System for Nafoora Field
The work consisted of drilling nine deep anode ground...
Supply & Installation of new 12" HFO line for Injecting Heavy Fuel Oil into Crude Oil for Export at Tobruk Refinery
EPC turnkey project for installation of a new 12" line...
Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Refurbishment of six (6) storage tanks (each: diameter...
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field
The scope of work included mechanical erection of one...