Our Project
BOSNA-S
Maintenance of Al Zawia Old Terminal
Summary of the Project:
Engineering, procurement and complete or partial replacement and refurbishment of tanks, pump houses, LPG spheres, truck loading gantries, electrical substation, instrumentation control system and control room, electrical and instrumentation cables and fire fighting systems.
Design of a new state of the art SCADA system for operation and monitoring of the terminal, interfacing and integration within the overall company DMS.
Project also included execution of all necessary mechanical works, piping, electrical works, instrumentation, civil works and fire fighting works as well as commissioning and start-up.
More Projects
Design, Supply and erection of three Tanks for Kerosene and one Floating Roof Tank for Gasoline at Misurata Terminal
Modernization of Fire Fighting System – Zelten Field Facilities
Installation of 2-18mw Gas Turbine Generator sets at GC1 Sarir Field
Maintenance of Al Zawia Old Terminal
Upgrading of Cathodic Protection System for Nafoora Field
Supply & Installation of new 12" HFO line for Injecting Heavy Fuel Oil into Crude Oil for Export at Tobruk Refinery
Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field