Supply & Installation of new 12″ HFO line for Injecting Heavy Fuel Oil into Crude Oil for Export at Tobruk Refinery
Summary of the Project:
EPC turnkey project for installation of a new 12″ line for injecting Heavy Fuel Oil (HFO) into a shipment of crude oil at Tobruk Refinery.
As part of the project complete detailed design for the new pipeline was undertaken, construction of new insulated 12” HFO pipeline complete with necessary valves, heat tracing system, flow control valves and a new custody transfer flowmeter.
More Projects
Design, Supply and erection of three Tanks for Kerosene and one Floating Roof Tank for Gasoline at Misurata Terminal
Modernization of Fire Fighting System – Zelten Field Facilities
Installation of 2-18mw Gas Turbine Generator sets at GC1 Sarir Field
Maintenance of Al Zawia Old Terminal
Upgrading of Cathodic Protection System for Nafoora Field
Supply & Installation of new 12" HFO line for Injecting Heavy Fuel Oil into Crude Oil for Export at Tobruk Refinery
Inspection & Enabling works for Tanks at Zawia Tank Farm Fields
Installation of one (1) Titan 130 Mobile Power Unit at 103D Field